{"id":1006222,"date":"2026-07-06T13:16:32","date_gmt":"2026-07-06T11:16:32","guid":{"rendered":"https:\/\/www.iterates.be\/?p=1006222"},"modified":"2026-07-10T15:38:39","modified_gmt":"2026-07-10T13:38:39","slug":"which-metrics-should-be-tracked-to-measure-a-digital-project","status":"publish","type":"post","link":"https:\/\/www.iterates.be\/en\/which-metrics-should-be-tracked-to-measure-a-digital-project\/","title":{"rendered":"Which metrics should be tracked to measure a digital project?"},"content":{"rendered":"<div class=\"vgblk-rw-wrapper limit-wrapper\">\n<p class=\"wp-block-paragraph\">Launching a digital project without defining its <strong>performance indicators<\/strong> Planning ahead is like sailing without a compass. Many companies measure success solely by whether a project is delivered on time and within budget. This is necessary, but not sufficient: a project delivered on time may still fail to meet its objectives if no one has defined what \u00absuccess\u00bb actually means in practical terms. Here are the key indicators to put in place, depending on the nature of the project.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Define your KPIs before development, not after<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The most common mistake is to try to measure results once the project is complete, using indicators chosen after the event. The <strong>KPIs<\/strong> (Key Performance Indicators) must be defined as early as the scoping phase, in direct relation to the business objectives that justify the investment.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Link each KPI to a specific business objective<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A relevant indicator answers a simple question: what is this project intended to improve? Reducing order processing time, increasing a website\u2019s conversion rate, reducing the number of support tickets: each objective calls for a <strong>a measurable and quantifiable indicator<\/strong>, with a baseline figure prior to the project and a target to be achieved.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Limit the number of indicators to ensure clarity<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Monitoring twenty indicators at the same time dilutes attention. A best practice is to define three to five priority KPIs per project, supplemented by secondary monitoring indicators. The aim is to produce a dashboard that can be used by business teams, not just by technical teams.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Measuring the application\u2019s technical performance<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Beyond business metrics, a digital project rests on technical foundations whose performance determines the user experience. These technical metrics are often invisible to senior management, but they have a direct impact on business results.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Loading times and availability<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Le <strong>loading time<\/strong> is one of the indicators most closely correlated with bounce rate and conversion. A loading time of more than three seconds results in a significant loss of visitors. Uptime measures the reliability of the service \u2014 99.9 % corresponds to fewer than nine hours of downtime per year.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Error rates and application stability<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Monitoring of the <strong>error rate<\/strong> (failed requests, crashes, unhandled exceptions) enable the rapid detection of regressions following an update or a spike in traffic. These metrics are central to the work of a <strong><a href=\"https:\/\/www.iterates.be\/en\/consulting\/aws-azure-or-gcp-devops-consultant\/\">DevOps consultant<\/a><\/strong>, which sets up monitoring and automatic alerting pipelines to maintain the stability of the application in production.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Assessing adoption and user experience<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A tool that is not used produces no results, however technically advanced it may be. The rate of\u2019<strong>adoption<\/strong> is one of the most telling indicators of a project\u2019s true success, and is often underestimated during the development phase.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Activation and retention rates<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Le <strong>activation rate<\/strong> measures the proportion of users who complete a key action after their first login. The retention rate measures how many return after a week or a month. These two metrics, which originate from product management, apply equally to internal applications and customer-facing products.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">UX metrics: journey completion and friction points<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The rate at which a form is completed, users dropping out at a specific stage of a conversion funnel, the time spent on a task: these UX metrics help to identify points of friction in the interface. A <strong><a href=\"https:\/\/www.iterates.be\/en\/consulting\/consultant-ux-ui-designer\/\">UX\/UI consultant<\/a><\/strong> uses this data to prioritise improvements and assess the impact of changes made to the interface.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Monitor the project\u2019s return on investment<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Le <strong>KING<\/strong> The return on investment for a digital project is rarely calculated with any precision. Yet it is the ultimate indicator for justifying the investment and deciding on future developments.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1000\" height=\"667\" src=\"https:\/\/www.iterates.be\/wp-content\/uploads\/2026\/06\/6400.jpg\" alt=\"\" class=\"wp-image-1006225\" style=\"aspect-ratio:1.4992854967554525;width:1000px;height:auto\" srcset=\"https:\/\/www.iterates.be\/wp-content\/uploads\/2026\/06\/6400.jpg 1000w, https:\/\/www.iterates.be\/wp-content\/uploads\/2026\/06\/6400-300x200.jpg 300w, https:\/\/www.iterates.be\/wp-content\/uploads\/2026\/06\/6400-768x512.jpg 768w, https:\/\/www.iterates.be\/wp-content\/uploads\/2026\/06\/6400-18x12.jpg 18w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><figcaption class=\"wp-element-caption\">Calculating ROI<\/figcaption><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Calculate direct operating profits<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A project to automate or digitise a process generates measurable benefits: hours saved, fewer errors, and shorter lead times. These benefits, converted into an hourly cost, can be used to calculate the return on investment over a period of twelve or twenty-four months. A <strong><a href=\"https:\/\/www.iterates.be\/en\/consulting\/data-consultant\/\">consultant data analyst<\/a><\/strong> can model these gains using the company\u2019s actual data and generate automated monitoring dashboards.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Measuring the impact on business indicators<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">For customer-focused projects \u2014 websites, mobile apps, e-commerce \u2014 business metrics are the most telling: revenue generated, customer acquisition cost, lifetime value. These metrics are tracked using a <strong><a href=\"https:\/\/www.iterates.be\/en\/sectors\/sales-marketing\/\">Custom CRM<\/a><\/strong> which centralises customer data in a unified dashboard.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Iterate based on data, not impressions<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A digital project does not end once it goes live. The metrics collected must feed into a cycle of continuous improvement, in which each change is prioritised on the basis of measured data rather than internal assumptions.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Introduce regular reviews of indicators<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A monthly or quarterly review of KPIs, involving both business and technical teams, enables priorities to be adjusted, deviations to be detected at an early stage, and alignment to be maintained between the company\u2019s objectives and the tool\u2019s development.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Validate changes before rolling them out on a large scale<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A <strong><a href=\"https:\/\/www.iterates.be\/en\/services\/mvp-poc\/\">MVP or a POC<\/a><\/strong> When properly implemented, this approach allows a feature to be tested within a limited scope, its actual impact on key metrics to be measured, and a decision to be made on an objective basis as to whether it is worth rolling out more widely \u2014 rather than relying on intuition or isolated user feedback.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Managing your digital project with iterates<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">iterates supports Brussels-based SMEs in defining their performance indicators, from the scoping phase right through to the roll-out of monitoring dashboards tailored to the objectives of each project. Whether it\u2019s bespoke development, consultancy or team support, every project is part of an approach focused on measurable results.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/cal.com\/rodolphebalay\/it-project-meeting-iterates\">Book a free appointment with an iterates expert<\/a><\/p>\n<\/div><!-- .vgblk-rw-wrapper -->","protected":false},"excerpt":{"rendered":"<p>Lancer un projet digital sans d\u00e9finir ses indicateurs de performance \u00e0 l&rsquo;avance, c&rsquo;est naviguer sans boussole. Beaucoup d&rsquo;entreprises \u00e9valuent le succ\u00e8s uniquement \u00e0 la livraison dans les d\u00e9lais et le budget. C&rsquo;est n\u00e9cessaire, mais insuffisant : un projet livr\u00e9 \u00e0 temps peut rater ses objectifs si personne n&rsquo;a d\u00e9fini ce que \u00ab\u00a0succ\u00e8s\u00a0\u00bb signifie concr\u00e8tement. Voici&#8230;<\/p>","protected":false},"author":1,"featured_media":1006224,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1243],"tags":[],"class_list":["post-1006222","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-conseils-it"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.10 - aioseo.com -->\n\t<meta name=\"description\" content=\"Lancer un projet digital sans d\u00e9finir ses indicateurs de performance \u00e0 l&#039;avance, c&#039;est naviguer sans boussole. Beaucoup d&#039;entreprises \u00e9valuent le succ\u00e8s uniquement \u00e0 la livraison dans les d\u00e9lais et le budget. C&#039;est n\u00e9cessaire, mais insuffisant : un projet livr\u00e9 \u00e0 temps peut rater ses objectifs si personne n&#039;a d\u00e9fini ce que &quot;succ\u00e8s&quot; signifie concr\u00e8tement. Voici\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Rodolphe Balay\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.iterates.be\/en\/which-metrics-should-be-tracked-to-measure-a-digital-project\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.10\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_GB\" \/>\n\t\t<meta property=\"og:site_name\" content=\"iterates -\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Quels indicateurs suivre pour mesurer un projet digital - iterates\" \/>\n\t\t<meta property=\"og:description\" content=\"Lancer un projet digital sans d\u00e9finir ses indicateurs de performance \u00e0 l&#039;avance, c&#039;est naviguer sans boussole. Beaucoup d&#039;entreprises \u00e9valuent le succ\u00e8s uniquement \u00e0 la livraison dans les d\u00e9lais et le budget. C&#039;est n\u00e9cessaire, mais insuffisant : un projet livr\u00e9 \u00e0 temps peut rater ses objectifs si personne n&#039;a d\u00e9fini ce que &quot;succ\u00e8s&quot; signifie concr\u00e8tement. Voici\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.iterates.be\/en\/which-metrics-should-be-tracked-to-measure-a-digital-project\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.iterates.be\/wp-content\/uploads\/2026\/06\/5148.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.iterates.be\/wp-content\/uploads\/2026\/06\/5148.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t\t<meta property=\"og:image:height\" content=\"667\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-07-06T11:16:32+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-07-10T13:38:39+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Quels indicateurs suivre pour mesurer un projet digital - iterates\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Lancer un projet digital sans d\u00e9finir ses indicateurs de performance \u00e0 l&#039;avance, c&#039;est naviguer sans boussole. Beaucoup d&#039;entreprises \u00e9valuent le succ\u00e8s uniquement \u00e0 la livraison dans les d\u00e9lais et le budget. C&#039;est n\u00e9cessaire, mais insuffisant : un projet livr\u00e9 \u00e0 temps peut rater ses objectifs si personne n&#039;a d\u00e9fini ce que &quot;succ\u00e8s&quot; signifie concr\u00e8tement. Voici\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.iterates.be\/wp-content\/uploads\/2026\/06\/5148.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.iterates.be\\\/en\\\/which-metrics-should-be-tracked-to-measure-a-digital-project\\\/#blogposting\",\"name\":\"Quels indicateurs suivre pour mesurer un projet digital - iterates\",\"headline\":\"Quels indicateurs suivre pour mesurer un projet digital\",\"author\":{\"@id\":\"https:\\\/\\\/www.iterates.be\\\/en\\\/author\\\/dev\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.iterates.be\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.iterates.be\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/5148.jpg\",\"width\":1000,\"height\":667},\"datePublished\":\"2026-07-06T13:16:32+02:00\",\"dateModified\":\"2026-07-10T15:38:39+02:00\",\"inLanguage\":\"en-GB\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.iterates.be\\\/en\\\/which-metrics-should-be-tracked-to-measure-a-digital-project\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.iterates.be\\\/en\\\/which-metrics-should-be-tracked-to-measure-a-digital-project\\\/#webpage\"},\"articleSection\":\"Conseils IT\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.iterates.be\\\/en\\\/which-metrics-should-be-tracked-to-measure-a-digital-project\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.iterates.be\\\/en#listItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/www.iterates.be\\\/en\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.iterates.be\\\/en\\\/category\\\/it-tips\\\/#listItem\",\"name\":\"Conseils IT\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.iterates.be\\\/en\\\/category\\\/it-tips\\\/#listItem\",\"position\":2,\"name\":\"Conseils IT\",\"item\":\"https:\\\/\\\/www.iterates.be\\\/en\\\/category\\\/it-tips\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.iterates.be\\\/en\\\/which-metrics-should-be-tracked-to-measure-a-digital-project\\\/#listItem\",\"name\":\"Quels indicateurs suivre pour mesurer un projet digital\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.iterates.be\\\/en#listItem\",\"name\":\"Accueil\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.iterates.be\\\/en\\\/which-metrics-should-be-tracked-to-measure-a-digital-project\\\/#listItem\",\"position\":3,\"name\":\"Quels indicateurs suivre pour mesurer un projet digital\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.iterates.be\\\/en\\\/category\\\/it-tips\\\/#listItem\",\"name\":\"Conseils IT\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.iterates.be\\\/en\\\/#organization\",\"name\":\"iterates\",\"url\":\"https:\\\/\\\/www.iterates.be\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.iterates.be\\\/wp-content\\\/uploads\\\/2025\\\/08\\\/iterates_logo.webp\",\"@id\":\"https:\\\/\\\/www.iterates.be\\\/en\\\/which-metrics-should-be-tracked-to-measure-a-digital-project\\\/#organizationLogo\",\"width\":1023,\"height\":305,\"caption\":\"Logo iterates - IT services & consulting\"},\"image\":{\"@id\":\"https:\\\/\\\/www.iterates.be\\\/en\\\/which-metrics-should-be-tracked-to-measure-a-digital-project\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/facebook.com\\\/\",\"https:\\\/\\\/x.com\\\/\",\"https:\\\/\\\/instagram.com\\\/\",\"https:\\\/\\\/pinterest.com\\\/\",\"https:\\\/\\\/youtube.com\\\/\",\"https:\\\/\\\/linkedin.com\\\/in\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.iterates.be\\\/en\\\/author\\\/dev\\\/#author\",\"url\":\"https:\\\/\\\/www.iterates.be\\\/en\\\/author\\\/dev\\\/\",\"name\":\"Rodolphe Balay\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.iterates.be\\\/en\\\/which-metrics-should-be-tracked-to-measure-a-digital-project\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0b42dd4a9de69e3b8bb448b5c67b7b09679bd8211b040fdcfd097b5b4d319e5b?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Rodolphe Balay\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.iterates.be\\\/en\\\/which-metrics-should-be-tracked-to-measure-a-digital-project\\\/#webpage\",\"url\":\"https:\\\/\\\/www.iterates.be\\\/en\\\/which-metrics-should-be-tracked-to-measure-a-digital-project\\\/\",\"name\":\"Quels indicateurs suivre pour mesurer un projet digital - iterates\",\"description\":\"Lancer un projet digital sans d\\u00e9finir ses indicateurs de performance \\u00e0 l'avance, c'est naviguer sans boussole. Beaucoup d'entreprises \\u00e9valuent le succ\\u00e8s uniquement \\u00e0 la livraison dans les d\\u00e9lais et le budget. C'est n\\u00e9cessaire, mais insuffisant : un projet livr\\u00e9 \\u00e0 temps peut rater ses objectifs si personne n'a d\\u00e9fini ce que \\\"succ\\u00e8s\\\" signifie concr\\u00e8tement. Voici\",\"inLanguage\":\"en-GB\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.iterates.be\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.iterates.be\\\/en\\\/which-metrics-should-be-tracked-to-measure-a-digital-project\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.iterates.be\\\/en\\\/author\\\/dev\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.iterates.be\\\/en\\\/author\\\/dev\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.iterates.be\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/5148.jpg\",\"@id\":\"https:\\\/\\\/www.iterates.be\\\/en\\\/which-metrics-should-be-tracked-to-measure-a-digital-project\\\/#mainImage\",\"width\":1000,\"height\":667},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.iterates.be\\\/en\\\/which-metrics-should-be-tracked-to-measure-a-digital-project\\\/#mainImage\"},\"datePublished\":\"2026-07-06T13:16:32+02:00\",\"dateModified\":\"2026-07-10T15:38:39+02:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.iterates.be\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.iterates.be\\\/en\\\/\",\"name\":\"iterates\",\"inLanguage\":\"en-GB\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.iterates.be\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Quels indicateurs suivre pour mesurer un projet digital - iterates<\/title>\n\n","aioseo_head_json":{"title":"Which metrics should you track to measure a digital project? - iterates","description":"Launching a digital project without defining its performance indicators in advance is like sailing without a compass. Many companies measure success solely by whether a project is delivered on time and within budget. This is necessary, but not sufficient: a project delivered on time may still fail to meet its objectives if no one has defined what \"success\" actually means in practical terms. Here are","canonical_url":"https:\/\/www.iterates.be\/en\/which-metrics-should-be-tracked-to-measure-a-digital-project\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.iterates.be\/en\/which-metrics-should-be-tracked-to-measure-a-digital-project\/#blogposting","name":"Quels indicateurs suivre pour mesurer un projet digital - iterates","headline":"Quels indicateurs suivre pour mesurer un projet digital","author":{"@id":"https:\/\/www.iterates.be\/en\/author\/dev\/#author"},"publisher":{"@id":"https:\/\/www.iterates.be\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.iterates.be\/wp-content\/uploads\/2026\/06\/5148.jpg","width":1000,"height":667},"datePublished":"2026-07-06T13:16:32+02:00","dateModified":"2026-07-10T15:38:39+02:00","inLanguage":"en-GB","mainEntityOfPage":{"@id":"https:\/\/www.iterates.be\/en\/which-metrics-should-be-tracked-to-measure-a-digital-project\/#webpage"},"isPartOf":{"@id":"https:\/\/www.iterates.be\/en\/which-metrics-should-be-tracked-to-measure-a-digital-project\/#webpage"},"articleSection":"Conseils IT"},{"@type":"BreadcrumbList","@id":"https:\/\/www.iterates.be\/en\/which-metrics-should-be-tracked-to-measure-a-digital-project\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.iterates.be\/en#listItem","position":1,"name":"Accueil","item":"https:\/\/www.iterates.be\/en","nextItem":{"@type":"ListItem","@id":"https:\/\/www.iterates.be\/en\/category\/it-tips\/#listItem","name":"Conseils IT"}},{"@type":"ListItem","@id":"https:\/\/www.iterates.be\/en\/category\/it-tips\/#listItem","position":2,"name":"Conseils IT","item":"https:\/\/www.iterates.be\/en\/category\/it-tips\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.iterates.be\/en\/which-metrics-should-be-tracked-to-measure-a-digital-project\/#listItem","name":"Quels indicateurs suivre pour mesurer un projet digital"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.iterates.be\/en#listItem","name":"Accueil"}},{"@type":"ListItem","@id":"https:\/\/www.iterates.be\/en\/which-metrics-should-be-tracked-to-measure-a-digital-project\/#listItem","position":3,"name":"Quels indicateurs suivre pour mesurer un projet digital","previousItem":{"@type":"ListItem","@id":"https:\/\/www.iterates.be\/en\/category\/it-tips\/#listItem","name":"Conseils IT"}}]},{"@type":"Organization","@id":"https:\/\/www.iterates.be\/en\/#organization","name":"iterates","url":"https:\/\/www.iterates.be\/en\/","logo":{"@type":"ImageObject","url":"https:\/\/www.iterates.be\/wp-content\/uploads\/2025\/08\/iterates_logo.webp","@id":"https:\/\/www.iterates.be\/en\/which-metrics-should-be-tracked-to-measure-a-digital-project\/#organizationLogo","width":1023,"height":305,"caption":"Logo iterates - IT services & consulting"},"image":{"@id":"https:\/\/www.iterates.be\/en\/which-metrics-should-be-tracked-to-measure-a-digital-project\/#organizationLogo"},"sameAs":["https:\/\/facebook.com\/","https:\/\/x.com\/","https:\/\/instagram.com\/","https:\/\/pinterest.com\/","https:\/\/youtube.com\/","https:\/\/linkedin.com\/in\/"]},{"@type":"Person","@id":"https:\/\/www.iterates.be\/en\/author\/dev\/#author","url":"https:\/\/www.iterates.be\/en\/author\/dev\/","name":"Rodolphe Balay","image":{"@type":"ImageObject","@id":"https:\/\/www.iterates.be\/en\/which-metrics-should-be-tracked-to-measure-a-digital-project\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/0b42dd4a9de69e3b8bb448b5c67b7b09679bd8211b040fdcfd097b5b4d319e5b?s=96&d=mm&r=g","width":96,"height":96,"caption":"Rodolphe Balay"}},{"@type":"WebPage","@id":"https:\/\/www.iterates.be\/en\/which-metrics-should-be-tracked-to-measure-a-digital-project\/#webpage","url":"https:\/\/www.iterates.be\/en\/which-metrics-should-be-tracked-to-measure-a-digital-project\/","name":"Quels indicateurs suivre pour mesurer un projet digital - iterates","description":"Lancer un projet digital sans d\u00e9finir ses indicateurs de performance \u00e0 l'avance, c'est naviguer sans boussole. Beaucoup d'entreprises \u00e9valuent le succ\u00e8s uniquement \u00e0 la livraison dans les d\u00e9lais et le budget. C'est n\u00e9cessaire, mais insuffisant : un projet livr\u00e9 \u00e0 temps peut rater ses objectifs si personne n'a d\u00e9fini ce que \"succ\u00e8s\" signifie concr\u00e8tement. Voici","inLanguage":"en-GB","isPartOf":{"@id":"https:\/\/www.iterates.be\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.iterates.be\/en\/which-metrics-should-be-tracked-to-measure-a-digital-project\/#breadcrumblist"},"author":{"@id":"https:\/\/www.iterates.be\/en\/author\/dev\/#author"},"creator":{"@id":"https:\/\/www.iterates.be\/en\/author\/dev\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.iterates.be\/wp-content\/uploads\/2026\/06\/5148.jpg","@id":"https:\/\/www.iterates.be\/en\/which-metrics-should-be-tracked-to-measure-a-digital-project\/#mainImage","width":1000,"height":667},"primaryImageOfPage":{"@id":"https:\/\/www.iterates.be\/en\/which-metrics-should-be-tracked-to-measure-a-digital-project\/#mainImage"},"datePublished":"2026-07-06T13:16:32+02:00","dateModified":"2026-07-10T15:38:39+02:00"},{"@type":"WebSite","@id":"https:\/\/www.iterates.be\/en\/#website","url":"https:\/\/www.iterates.be\/en\/","name":"iterates","inLanguage":"en-GB","publisher":{"@id":"https:\/\/www.iterates.be\/en\/#organization"}}]},"og:locale":"en_GB","og:site_name":"iterates -","og:type":"article","og:title":"Quels indicateurs suivre pour mesurer un projet digital - iterates","og:description":"Lancer un projet digital sans d\u00e9finir ses indicateurs de performance \u00e0 l'avance, c'est naviguer sans boussole. Beaucoup d'entreprises \u00e9valuent le succ\u00e8s uniquement \u00e0 la livraison dans les d\u00e9lais et le budget. C'est n\u00e9cessaire, mais insuffisant : un projet livr\u00e9 \u00e0 temps peut rater ses objectifs si personne n'a d\u00e9fini ce que &quot;succ\u00e8s&quot; signifie concr\u00e8tement. Voici","og:url":"https:\/\/www.iterates.be\/en\/which-metrics-should-be-tracked-to-measure-a-digital-project\/","og:image":"https:\/\/www.iterates.be\/wp-content\/uploads\/2026\/06\/5148.jpg","og:image:secure_url":"https:\/\/www.iterates.be\/wp-content\/uploads\/2026\/06\/5148.jpg","og:image:width":1000,"og:image:height":667,"article:published_time":"2026-07-06T11:16:32+00:00","article:modified_time":"2026-07-10T13:38:39+00:00","twitter:card":"summary_large_image","twitter:title":"Quels indicateurs suivre pour mesurer un projet digital - iterates","twitter:description":"Lancer un projet digital sans d\u00e9finir ses indicateurs de performance \u00e0 l'avance, c'est naviguer sans boussole. Beaucoup d'entreprises \u00e9valuent le succ\u00e8s uniquement \u00e0 la livraison dans les d\u00e9lais et le budget. C'est n\u00e9cessaire, mais insuffisant : un projet livr\u00e9 \u00e0 temps peut rater ses objectifs si personne n'a d\u00e9fini ce que &quot;succ\u00e8s&quot; signifie concr\u00e8tement. Voici","twitter:image":"https:\/\/www.iterates.be\/wp-content\/uploads\/2026\/06\/5148.jpg"},"aioseo_meta_data":{"post_id":"1006222","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"projet digital","score":69,"analysis":{"keyphraseInTitle":{"score":9,"maxScore":9,"error":0},"keyphraseInDescription":{"score":9,"maxScore":9,"error":0},"keyphraseLength":{"score":9,"maxScore":9,"error":0,"length":2},"keyphraseInURL":{"score":5,"maxScore":5,"error":0},"keyphraseInIntroduction":{"score":9,"maxScore":9,"error":0},"keyphraseInSubHeadings":{"score":3,"maxScore":9,"error":1},"keyphraseInImageAlt":{"score":3,"maxScore":9,"error":1},"keywordDensity":{"score":0,"type":"low","maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"seo_analyzer_scan_date":"2026-07-10 14:57:45","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":{"faqs":[],"keyPoints":[],"schemas":[],"titles":[],"descriptions":[],"socialPosts":{"email":{"subject":"","preview":"","content":""},"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2026-06-25 11:16:33","updated":"2026-07-10 15:18:29"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.iterates.be\/en\" title=\"Accueil\">Accueil<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u203a<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.iterates.be\/en\/category\/it-tips\/\" title=\"Conseils IT\">Conseils IT<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u203a<\/span><span class=\"aioseo-breadcrumb\">\n\tQuels indicateurs suivre pour mesurer un projet digital\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Accueil","link":"https:\/\/www.iterates.be\/en"},{"label":"Conseils IT","link":"https:\/\/www.iterates.be\/en\/category\/it-tips\/"},{"label":"Quels indicateurs suivre pour mesurer un projet digital","link":"https:\/\/www.iterates.be\/en\/which-metrics-should-be-tracked-to-measure-a-digital-project\/"}],"_links":{"self":[{"href":"https:\/\/www.iterates.be\/en\/wp-json\/wp\/v2\/posts\/1006222","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.iterates.be\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.iterates.be\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.iterates.be\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.iterates.be\/en\/wp-json\/wp\/v2\/comments?post=1006222"}],"version-history":[{"count":1,"href":"https:\/\/www.iterates.be\/en\/wp-json\/wp\/v2\/posts\/1006222\/revisions"}],"predecessor-version":[{"id":1006226,"href":"https:\/\/www.iterates.be\/en\/wp-json\/wp\/v2\/posts\/1006222\/revisions\/1006226"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.iterates.be\/en\/wp-json\/wp\/v2\/media\/1006224"}],"wp:attachment":[{"href":"https:\/\/www.iterates.be\/en\/wp-json\/wp\/v2\/media?parent=1006222"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.iterates.be\/en\/wp-json\/wp\/v2\/categories?post=1006222"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.iterates.be\/en\/wp-json\/wp\/v2\/tags?post=1006222"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}